Many mine owners look first at the delivered price per kilogram. But the real cost is:

  1. How much reagent is consumed per ton of ore;

  2. How much gold is recovered;

  3. How stable the leaching circuit is;

  4. Whether downstream carbon adsorption, detoxification, and solution management costs increase.

A lower-priced reagent does not always reduce cost. If consumption rises or recovery falls, the total cost per ton may be higher.

Key message: Low unit price does not mean low cost. Look at reagent cost per ton of ore, gold recovery, and circuit stability together.


1. Calculate Three Numbers First

Use the same production period for reagent use, ore tonnage, and recovered gold.

ItemCalculationPlain-language meaning
Reagent cost per tonReagent used (kg) × delivered price per kg ÷ dry ore treated (t)Reagent cost for each ton of dry ore
Total leaching chemical costSum of all reagent costs in the leaching circuitInclude all leaching reagents, not just one product
Cost per recovered ounceTotal leaching chemical cost ÷ recovered gold (oz)Reagent cost for each ounce of gold recovered

1 oz is about 31.1 g. If your site uses grams, convert consistently and compare all results on the same basis.

cnlite1.jpg

Data checks before comparing

ItemWhat to doWhy it matters
Reagent usedUse actual consumption from inventory and addition records where possibleConverts unit price into real operating cost
Dry ore treatedUse dry tonnage and reconcile moisture and tonnageMixing wet and dry tonnage causes wrong results
Gold recoveryCheck head, residue, and solution assaysPrevents “saving reagent but losing gold”
Ore domainCompare by ore type or feed sourcePrevents comparing unlike ores
Data limitsIf inventory corrections are unavailable, state the limitationKeeps the comparison honest and credible

Do not mix laboratory dosage with plant consumption. Do not use wet tonnage in one calculation and dry tonnage in another.


2. What Drives Reagent Consumption?

Reagent demand is a response to ore conditions, process conditions, and operating practice—not a fixed property of a product. The same reagent may perform differently at another mine.

FactorPossible effectWhat to check on site
Gold occurrenceFine or locked gold may not contact the reagentMineralogy, grind size, gold particle size
Oxidation and sulfide contentDifferent ore types may need different reagent dosesTest representative samples by ore domain
Copper or other cyanide-soluble mineralsMay increase reagent consumptionMineral analysis
Carbonaceous materialMay adsorb gold or reagents and cause lossesCarbon content and type
Grind sizeToo coarse exposes less gold; too fine may create slimesGrind size and particle-size distribution
pH, dissolved oxygen, solids densityAffect leaching reaction and reagent efficiencySite records against test or design basis
Leaching time and reagent addition pointsInsufficient time or poor addition reduces performanceResidence time and addition points
Operating controlPoor control can turn a reasonable dose into wasteAddition records, sampling, operator practice

Important: A high addition rate is not proof that the ore truly needs more reagent. Check sampling, assays, pH, dissolved oxygen, solids density, and addition points before increasing dosage.


3. How to Run a Useful Reagent Comparison

Keep the sample, grind, solids density, and test duration consistent. Change one reagent condition at a time. Record all operating conditions.

Test requirementWhat to doPurpose
Representative sampleUse the same ore type and a representative sampleAvoid misleading results from different ores
Consistent conditionsKeep grind, solids density, and test time the sameMake results comparable
One change at a timeChange only one reagent or dose per testIdentify what actually caused the effect
Measure gradesMeasure head and residue gradesConfirm whether recovery is stable
Measure consumption and lossesRecord reagent use and relevant solution lossesCalculate real cost
Repeat testsInclude enough repeats to show the difference is realAvoid treating normal variation as a result
Plant trial checksReconcile reagent inventory and dry tonnage over the same period; separate feed changes from reagent effectsProve performance at plant scale
Total cost viewCompare recovery and total processing cost, not only chemical spend; include downstream effects where relevantConfirm whether savings are real

If the answers are not supported by test or plant data, the trial is not finished. Product-specific dosage, recovery, or savings claims require verified evidence: [CNLITE to provide verified data].


4. Three Questions Before Purchasing

Do not ask only “What is your price per kilogram?” Ask these first.

QuestionAcceptable evidenceIf evidence is missing
Does the reagent work on this ore under controlled conditions?Test data from representative samplesRun tests before buying at scale
Is recovery stable at the proposed dosage?Repeat tests and plant dataContinue testing; do not rely on one result
Does the delivered cost per ton or per recovered ounce improve after all operating effects are counted?Lower total cost without lower recoveryDo not buy based only on low unit price

5. Conclusion: Buy the Total Cost per Ton, Not the Lowest Price per Kilogram

If you look only at unit priceLook instead at the total account
Lower price per kilogramIs reagent cost per ton of ore lower?
Supplier says dosage is lowIs actual plant consumption lower?
Good result in one testIs recovery stable in repeat tests and plant operation?
Chemical spend fallsDoes total processing cost and cost per recovered ounce fall?
Reagent is cheaperDo downstream carbon, detoxification, and solution costs increase?

Need Help Reviewing Gold Leaching Chemical Costs?

Send CNLITE your:

  • Ore type;

  • Gold grade;

  • Daily processing capacity;

  • Current leaching method;

  • Available test results.

Feel free to contect us! The CNLITE technical team can help review the comparison basis and identify missing checks before a reagent trial—so you avoid “looking only at unit price and calculating the wrong total cost.”


Leave Message

Please leave your message here! We will send detail technical info and quotation to you!

  • PDF / DOC / JPG / DWG / XLS

@2018 Yantai CNLITE Mineral Processing Reagents Co., Ltd.

logo

Get Quote

contact
Leave Message
whatsapp